Grounded Site Surveys
and Infrastructure Installation.
We don't just consult. We handle the physical reality of data center construction and retrofitting—delivering turnkey site layout, structural auditing, and certified equipment rigging.
Our Turnkey Deployment Process
From empty space to operational computing cluster in a structured, verified progression:
1. Spatial Site Analysis
Using our geographic intelligence maps, we locate exact grid coordinates where high-capacity telecom backbones intersect with high-voltage utility power. This identifies optimal site locations across Canada before capital is committed.
2. Pre-Construction Audit
We conduct structural, thermal, and electrical surveys of the target facility. We verify floor weight tolerances, inspect main switchgear, evaluate cooling loop pathways, and model airflow before server hardware is delivered.
3. Installation & Rigging
Certified engineering teams handle the physical rigging of HydroCore™ immersion pods or containment aisles. We connect primary and secondary cooling loops (water, dry-cooler, or gas-based) and integrate high-capacity busway power distribution.
4. Telemetry Integration & Commissioning
We verify system operation under load. Every node is registered on the DCO control plane, sensor telemetry is validated through the Sentient NOC pipeline, and backup loops are tested for out-of-the-box readiness.
DC Survey & Installation FAQ
How does the spatial site selection module analyze regional grids?
Our spatial selection tool maps high-voltage distribution lines, utility substation capacities, and bulk carrier telecom paths. It overlays these datasets to flag coordinate intersections that can support high-density compute loads (10MW+) with minimal transit infrastructure build-out costs.
What mechanical certifications do your installation crews hold?
AltaAI rigging and installation teams are certified mechanical and electrical contractors. They hold advanced certifications for structural rigging, high-pressure piping installation (for closed-loop CDUs), and industrial switchgear wiring, conforming to Canadian and international electrical standards.
How long does a typical physical installation survey take?
A standard pre-construction structural and electrical site survey requires 3 to 5 business days on site, depending on the facility size. We deliver a detailed feasibility report within 2 weeks, covering structural loading analysis, utility capacity mapping, and physical layout designs.